Skip to main content

ATHNDT

Case Study: Onsite Level NDT Testing

Onsite Level 2 Testing for Lancashire-Based Aerospace Company

ATH NDT Ltd have been working with this aerospace company for 6 years. 5 Years ago we designed and installed a Fluorescent Penetrant System. We have also supplied Level 3 services.

The Project

The company had experienced a high turnover of trained and approved NDT staff.

Thus, leaving them without approved personnel to carry out NDT Fluorescent Penetrant Testing at their own facility. This in turn caused longer lead times and they were not in full control of the components they manufactured internally.   

The Outcome

ATH NDT suggested one of their staff become approved to give the company continuity and control.

Tony Heaton of ATH NDT successfully passed the examinations to become Level 2 approved to test their components internally, without the need to subcontract their components.

Moving forward the company can now continue testing their components until they find a suitable candidate.

That candidate will then be trained and operate alongside Mr Heaton, providing continuity. Their components and products can continue to be tested onsite without the need to subcontract, which in turn saves lead times and helps with cashflow.

Industry

Aerospace

Location

Lancashire

Read some of our features on Aerospace.

ATH NDT deepsea NDT

Overcoming the Deep-Sea Bottleneck: Why Flawless NDT in Subsea Components Prevents Catastrophic Failures

Blog Post: non-destrcutive testing in subsea environments Overcoming the Deep-Sea Bottleneck: Why Flawless NDT in Subsea Components Prevents Catastrophic Failures Operating in deep-sea environments presents some of the most unforgiving engineering challenges on Earth. Subsea components, from blowout preventers to high-pressure piping manifolds, must withstand immense hydrostatic pressure, highly corrosive

Read More »